INFRASTRUCTURE & CONCRETE
Paragon Channel Drainage Improvements
El Paso, Texas

Client: City of El Paso
Description:
This project involved site work and channel drainage improvements, including the removal of the channel lining, chain link fence and asphalt pavement, and off-site disposal. Work included preparation of the channel subgrade, furnishing and installation of a rock wall, chain link fence and gates, trapezoidal channel concrete lining, rectangular channel concrete walls and bottom slab, an energy dissipater concrete structure, concrete flumes, ramps, and concrete rip rap. Additional work included installation of asphalt pavement restoration, sub-grade, base course and HMAC, installation of 48″ R.C.P. headwall, traffic control, and monitoring storm water pollution prevention measures.